USD2,450.00
NVOCC · 货代 · SCAC YSGS
YSGSGlobelink 集装箱追踪
追踪 Globelink 的货物,查看每个码头事件、船舶和最新 ETA。
Globelink
目录数据- SCAC
- YSGS
- 追踪方式
- 提单订舱
- 类型
- NVOCC / 货代
Globelink 集装箱追踪示例
我们的集装箱追踪工具可让您监控货运进度,包括当前位置、预计到达时间(ETA)和航线历史,并在途中接收实时通知。
最后更新:24 Sep, 22:35
集装箱追踪时间线
Yangon, MM Empty to Shipper26 Jul 2026, 00:00
Yangon, MM Export received at CY27 Jul 2026, 00:00
Yangon, MM Full Transshipment Loaded28 Jul 2026, 00:00
Singapore, SG Full Transshipment Discharged03 Aug 2026, 00:00
Singapore, SG Full Transshipment Positioned Out05 Aug 2026, 00:00
Globelink 运价
Globelink 某条主要航线的参考海运运价。打开运费计算器,比较您自己航线的运价。
演示用示例运价
Globelink 追踪号码格式
每种号码在哪里找到以及它的样式。
| 号码 | 格式 | 示例 | 在哪里找到 |
|---|---|---|---|
| 提单 | 因承运人而异,通常前面带 SCAC | YSGS… | 提单右上角;到货通知中也有 |
| 订舱 | 因承运人而异 | — | 承运人或货代的订舱确认 |
Globelink 集装箱追踪状态说明
用通俗的语言解释承运人显示的事件名称。
- GATE-OUT EMPTY
空箱从堆场放给发货人装货。
- GATE-IN
重箱已进入出口码头。
- LOAD
集装箱已装上指定船舶和航次。
- DEPARTURE
船舶已离港。下一个事件将发生在中转港或目的港。
- DISCHARGE
集装箱已在中转港或卸货港卸船。
- GATE-OUT
集装箱已离开码头运往收货人,开始计算滞箱费。
- GATE-IN EMPTY
空箱已还回堆场,运输完成。
- CUSTOMS HOLD
集装箱因查验或单证缺失被扣留,请联系您的报关行。
关于 Globelink 追踪
Globelink 是一家签发自有提单的货代(NVOCC),SCAC 为 YSGS。
请将号码粘贴到上方表单中。集装箱号会在您输入时校验,因此在搜索前就能发现输入错误。
Globelink container tracking
Three pallets of bathroom tiles, one shared box, and a customer who wants to know why the ship left without them.
That's a pretty normal day in LCL, and it's the world Globelink lives in. The company is a consolidator: it collects smaller shipments from forwarders, stuffs them together into one container and sends that box out on somebody else's vessel. Its customers are mostly other freight forwarders, not the end importer, so a lot of people searching for Globelink container tracking have never actually spoken to Globelink. They got a reference from their own forwarder and want to see what's going on.
On Globy it's simple enough. Type the number, Globelink is already chosen as the carrier on this page, and the result shows the status, the vessel the consolidated box is sailing on, the events so far and an ETA. There's a map with the ship's position too. Nothing to install. If the ETA moves (and with consolidation services it does move, often because the box sits a few days at the CFS waiting to be filled) the date on the screen changes and you get a notification about it.
Which number to use is where it gets a bit confusing. Globelink tracking works with a bill of lading number or a booking number, not with a container number. And there are usually two bills of lading floating around. The master B/L is the one the ocean carrier issues to Globelink for the whole container. The house B/L is the one issued for your part of it, your three pallets. As the shipper or consignee you normally hold the house B/L (or your forwarder does), and that's the one to enter for Globelink shipment tracking. The booking number helps earlier, before the cargo is even received at the warehouse. If you'd rather track a Globelink container by its box number, that's possible too, but the box belongs to the ocean line and carries their prefix, so you'd look it up under that carrier instead.
The timeline for LCL has a few extra steps compared to a full container. Cargo received at the origin CFS, stuffed, gate-in at the port, loaded, maybe a transshipment in a hub like Singapore or Colombo, discharged, then devanning at the destination CFS before your pallets are free to go. That last part trips people up. The vessel can arrive on Monday and your goods still won't be ready until Thursday because the box has to be unpacked and split. Globelink cargo tracking shows the ocean part well, the warehouse part depends on what gets reported.
For planning, the useful dates are discharge and availability at the CFS. Customs clearance can usually start once the house B/L and invoice are in order, and it's worth doing that before arrival so storage charges don't start running. Make sure the consignee details on the house B/L match the import documents, because a typo there is surprisingly common and slows the release.
When the number shows nothing, it's often because the consolidation hasn't closed yet and the box hasn't been assigned to a vessel. Give it a day. If the status then sits still for a week, ask your forwarder to check with Globelink directly - the Globelink container tracking timeline can only display what's been reported to it.
常见问题
如何查询Globelink集装箱的到达日期? 

搜索货运记录,查找目的港或交货地点对应的ETA。如果有多个日期,请确认各自所属的运输阶段。Globelink预计到港日期不一定等于收货人实际收到货物的日期。
Globelink跟踪中的ETA与实际到达有什么区别? 

ETA是预测,实际到达则记录了在指定地点已经发生的事件。查看Globelink结果时,请同时阅读日期和事件标签,以区分未来估算与已完成的移动。
到港是否意味着Globelink货物已经可以提取? 

不一定。船舶可能已到港,但集装箱尚未卸船,或码头尚未开放提取。派车前,请与负责Globelink货物的相关方确认放行条件和提货安排。
Globelink货物开船前可以跟踪吗? 

当相关记录可用时,开船前可能已显示订舱信息或起运地事件。查询需要Globelink支持的编号。如果尚无记录,请与托运人确认订舱情况,不要直接认为货物已经启运。
为什么Globelink集装箱仍显示在起运港? 

起运港可能是最后记录的实际地点,离港更新也可能尚未提供。请核对事件时间以及它是计划事件还是实际事件。如果Globelink货物按计划应已开船,请向订舱管理方确认。
Globelink船期查询与货运跟踪是一回事吗? 

不是。船期描述各地点之间计划提供的航运服务,跟踪则查看特定Globelink货物或集装箱的现有记录。规划路线时使用船期,查询已订舱货物的运输进度时使用跟踪。
全部承运人 A–Z
Globy 上的所有船公司和 NVOCC,按 A 到 Z 排列。
A
B
C
E
G
H
M
N
O
P
S
- SACO Shipping Line
- Safetrans Line
- Salam Pacific Indonesia Lines
- Samudera Shipping Line
- Sarjak Container Lines
- Sea Hawk Lines
- Sea Legend Shipping
- Seaboard Marine
- Sealand
- Seatrade
- Seino Logix Co
- SETH Shipping
- Shandong Marine Corporation
- Shanghai League Shipping
- Shipco Transport
- Shipping Corporation of India
- Sidra Line
- Sinokor
- Sinotrans Container Lines
- SITC Container Lines
- SM Line
- STC
- Sunmarine Shipping Services
- Swire Shipping
T
W
Z