USD2,450.00
船公司 · SCAC SFTU

Safetrans Line 集装箱追踪
追踪 Safetrans Line 的集装箱、提单和订舱,查看每个码头事件、船舶和最新 ETA。
Safetrans Line Limited
目录数据- SCAC
- SFTU
- 追踪方式
- 集装箱提单订舱
- 类型
- 船公司
- 联盟
- 独立运营
- 网站
- safetransline.com
Safetrans Line 集装箱追踪示例
我们的集装箱追踪工具可让您监控货运进度,包括当前位置、预计到达时间(ETA)和航线历史,并在途中接收实时通知。
最后更新:24 Sep, 22:35
集装箱追踪时间线
Yangon, MM Empty to Shipper26 Jul 2026, 00:00
Yangon, MM Export received at CY27 Jul 2026, 00:00
Yangon, MM Full Transshipment Loaded28 Jul 2026, 00:00
Singapore, SG Full Transshipment Discharged03 Aug 2026, 00:00
Singapore, SG Full Transshipment Positioned Out05 Aug 2026, 00:00
Safetrans Line 运价
Safetrans Line 某条主要航线的参考海运运价。打开运费计算器,比较您自己航线的运价。
演示用示例运价
Safetrans Line 追踪号码格式
每种号码在哪里找到以及它的样式。
| 号码 | 格式 | 示例 | 在哪里找到 |
|---|---|---|---|
| 集装箱 | 4 个字母 + 7 位数字(ISO 6346) | SFTU9070320 | 在箱门、提单和装箱单上 |
| 提单 | 因承运人而异,通常前面带 SCAC | SFTU… | 提单右上角;到货通知中也有 |
| 订舱 | 因承运人而异 | — | 承运人或货代的订舱确认 |
Safetrans Line 集装箱追踪状态说明
用通俗的语言解释承运人显示的事件名称。
- GATE-OUT EMPTY
空箱从堆场放给发货人装货。
- GATE-IN
重箱已进入出口码头。
- LOAD
集装箱已装上指定船舶和航次。
- DEPARTURE
船舶已离港。下一个事件将发生在中转港或目的港。
- DISCHARGE
集装箱已在中转港或卸货港卸船。
- GATE-OUT
集装箱已离开码头运往收货人,开始计算滞箱费。
- GATE-IN EMPTY
空箱已还回堆场,运输完成。
- CUSTOMS HOLD
集装箱因查验或单证缺失被扣留,请联系您的报关行。
关于 Safetrans Line 追踪
Safetrans Line 是一家海运公司,SCAC 为 SFTU。
请将号码粘贴到上方表单中。集装箱号会在您输入时校验,因此在搜索前就能发现输入错误。
Safetrans container tracking
"Does it go straight to St Petersburg or does it stop somewhere first?" is the question we get most about Safetrans.
Depends which loop you're on, honestly. The Bronka terminal in St Petersburg announced its connection with Safetrans Line in February 2023 - that's when the line came onto China to Russia - and the service has since gone by the name St Petersburg Direct. Qingdao, Shanghai and Ningbo, then Nansha, and on some sailings a call at Tangier before the long haul up to the Baltic. So "direct" mostly means your box isn't transshipped, not that the ship skips every port. Safetrans also runs from China to Vietnam, Thailand, Indonesia and Turkey, and on some of the Russian sailings it has worked with OVP Shipping, so don't be surprised if the vessel name on your screen isn't one you'd connect with the brand.
You'll see all of that in Safetrans container tracking. Put a number in (the carrier is already set on this page) and you get the status, the vessel it's on now, the events and an ETA, plus the ship on a map. The map is the bit of Safetrans line tracking I'd actually open once a week, because it shows whether the ship is where the schedule says or still somewhere off Morocco.
Three kinds of numbers work. The container number is the usual one, letters plus seven digits, taken from the door of the box or from the packing list. The bill of lading number shows every container on that B/L together, good for anyone with a mixed shipment split over several units. And before the cargo is loaded, a booking number often gets you the first events - empty released, gate-in at the port of loading. If one number comes up blank in Safetrans tracking, try another. The first day or two after loading can be patchy.
The timeline is the plain sequence, gated in and loaded, off it goes, a port call or two if the loop has them, and then discharge in St Petersburg, out of the gate and the empty back. Each with a date and a place. Every time the ETA moves you get a notification. On this lane that's more often than anyone would like, and the reason is usually dull - a slow berth at the far end, or the ship sitting a day off Tangier because the slot isn't ready.
At the Russian end Safetrans cargo tracking is what tells you when to get going on customs. It's not the kind of declaration you want to put together on the morning of discharge, and once the box is off the ship the terminal starts charging storage anyway. A rough rule some people use is to start the paperwork when the vessel goes through the Danish straits. If somebody else is the consignee, give them the B/L number and let them do their own Safetrans shipment tracking.
One more name you might run into. Sea Legend, which runs Arctic sailings from China to Europe, has been described as an affiliate of Safetrans Line, but it's a separate service with its own numbers. A forwarder mixing the two up in an email happens.
No events for days, or a box parked on "discharged" with no gate-out? Ask the line or whoever booked it, since Safetrans container tracking only knows what the carrier and the terminals report.
The Baltic in winter adds a few days. Plan for them.
常见问题
搜索Safetrans Line集装箱前应检查什么? 

准备完整货运编号,并确认Safetrans Line表单支持哪些编号类型。请与运输单据核对,不要仅凭记忆输入。同时确认选择的是负责该票货物的公司。
为什么我的Safetrans Line跟踪编号无法识别? 

输入错误、不支持的编号类型或尚未可用的记录都可能导致无法匹配。请核对完整编号及Safetrans Line选择。如果仍不成功,请让托运人确认运输编号和货物的当前信息。
可以通过集装箱号的字母判断是Safetrans Line吗? 

标准集装箱号的前缀识别注册所有人或主要运营人,不一定代表本航次的承运人。请通过订舱或运输单据确认是否由Safetrans Line承运,不要只依赖箱号前缀。
为什么Safetrans Line跟踪连续几天没有变化? 

跟踪通常以关键事件为基础,港口之间或等待下一次移动时可能没有新记录。请查看最新日期和预期的下一阶段。如果Safetrans Line货物似乎已延误,请向订舱管理方索取实际作业更新。
没有Safetrans Line跟踪结果是否意味着集装箱丢失? 

不是。查不到结果不能证明货物丢失。请先确认编号、负责的承运人及记录是否已可查询。如果仍找不到Safetrans Line货物,请提供原始订舱信息并联系托运人或货运代理。
咨询Safetrans Line跟踪问题时应提供哪些信息? 

请提供货运参考编号、已知的集装箱号、起运地和目的地,以及看到的最新事件或错误信息。准备好订舱确认或提单,方便负责Safetrans Line货物的人员核查具体记录。
全部承运人 A–Z
Globy 上的所有船公司和 NVOCC,按 A 到 Z 排列。
A
B
C
E
G
H
M
N
O
P
S
- SACO Shipping Line
- Safetrans Line
- Salam Pacific Indonesia Lines
- Samudera Shipping Line
- Sarjak Container Lines
- Sea Hawk Lines
- Sea Legend Shipping
- Seaboard Marine
- Sealand
- Seatrade
- Seino Logix Co
- SETH Shipping
- Shandong Marine Corporation
- Shanghai League Shipping
- Shipco Transport
- Shipping Corporation of India
- Sidra Line
- Sinokor
- Sinotrans Container Lines
- SITC Container Lines
- SM Line
- STC
- Sunmarine Shipping Services
- Swire Shipping
T
W
Z
