• 帮助中心

船公司 · SCAC 11DX

11DX

CNC 集装箱追踪

追踪 CNC 的集装箱、提单和订舱,查看每个码头事件、船舶和最新 ETA。

Cheng Lie Navigation Co., Ltd.

目录数据
SCAC
11DX
追踪方式
集装箱提单订舱
类型
船公司
总部
Taipei, Taiwan
网站
cnc-line.com

CNC 集装箱追踪示例

我们的集装箱追踪工具可让您监控货运进度,包括当前位置、预计到达时间(ETA)和航线历史,并在途中接收实时通知。

ABCU9070329

LOAD
提单 254810936

最后更新:24 Sep, 22:35

装货港卸货港
Ningbo, CNNGBRotterdam, NLRTM
ATD 12 Aug, 2025 ETA 30 Sep, 2025

集装箱追踪时间线

  1. Yangon, MM Empty to Shipper26 Jul 2026, 00:00
  2. Yangon, MM Export received at CY27 Jul 2026, 00:00
  3. Yangon, MM Full Transshipment Loaded28 Jul 2026, 00:00
  4. Singapore, SG Full Transshipment Discharged03 Aug 2026, 00:00
  5. Singapore, SG Full Transshipment Positioned Out05 Aug 2026, 00:00

CNC 运价

CNC 某条主要航线的参考海运运价。打开运费计算器,比较您自己航线的运价。

演示用示例运价

CNC 追踪号码格式

每种号码在哪里找到以及它的样式。

号码格式示例在哪里找到
集装箱4 个字母 + 7 位数字(ISO 6346)ABCU9070329在箱门、提单和装箱单上
提单因承运人而异,通常前面带 SCAC11DX…提单右上角;到货通知中也有
订舱因承运人而异—承运人或货代的订舱确认

CNC 集装箱追踪状态说明

用通俗的语言解释承运人显示的事件名称。

  • GATE-OUT EMPTY

    空箱从堆场放给发货人装货。

  • GATE-IN

    重箱已进入出口码头。

  • LOAD

    集装箱已装上指定船舶和航次。

  • DEPARTURE

    船舶已离港。下一个事件将发生在中转港或目的港。

  • DISCHARGE

    集装箱已在中转港或卸货港卸船。

  • GATE-OUT

    集装箱已离开码头运往收货人,开始计算滞箱费。

  • GATE-IN EMPTY

    空箱已还回堆场,运输完成。

  • CUSTOMS HOLD

    集装箱因查验或单证缺失被扣留,请联系您的报关行。

关于 CNC 追踪

CNC (Cheng Lie Navigation) 是一家海运公司,SCAC 为 11DX。

请将号码粘贴到上方表单中。集装箱号会在您输入时校验,因此在搜索前就能发现输入错误。

CNC container tracking

The code on this page, 11DX, looks more like a typo than a carrier code, and it confuses people who expect four tidy letters.

It's just an identifier for the carrier in the data. It has nothing to do with the letters on your container, so don't go looking for 11DX on the box. The box will carry its owner's four-letter prefix, which for a CNC shipment may well be a group prefix rather than anything with CNC in it.

That group connection is the main thing to know about CNC. The full name is Cheng Lie Navigation, a Taiwanese company founded in Taipei in 1971 by K.C. Chow. In 2007 the French CMA CGM group bought it, and CNC became the group's intra-Asia line. Later on APL, which also belongs to CMA CGM, moved its intra-Asia business under the CNC brand, run from Singapore. So if you used to book short Asian routes with APL, there's a good chance your newer shipments are CNC bookings. Older APL references still belong to APL, and you'd look those up on the APL page.

Globy takes three types of number for CNC container tracking. The container number (four letters, seven digits). The bill of lading number, good for multi-container shipments. And the booking number, from the moment space is confirmed. If one draws a blank, try another - booking-to-B/L links get made at different points depending on the origin office.

CNC container tracking goes like this. Type the number, CNC is already chosen on this page, and you see the status, the current vessel, the list of events and the ETA, plus the vessel on the map. When the ETA moves, you get a notification and the date on the screen changes with it. No special software. The vessel name might be a CMA CGM or APL ship, or a chartered feeder with a name you've never heard of, all perfectly normal on intra-Asia routes where the group shares ships.

Intra-Asia means a lot of hubs. A box from Haiphong to Chennai or from Manila to Laem Chabang would typically pass through a hub like Singapore, Port Klang, Hong Kong or Kaohsiung on the way. In CNC cargo tracking you'll see gate-in, loaded, departed, discharged at the hub, loaded on the next ship, departed again, discharged at destination, gate-out, empty return. The hub step is where time disappears. Two days is normal, ten days means the box missed a connection, and that's the moment to ask.

For a logistics team, the use is fairly practical. Vietnamese, Indian and Indonesian customs all have their own document rules, so start the paperwork when CNC shipment tracking shows the second departure, not when the box arrives. Watch free time at destination, it's short in many Southeast Asian terminals. And for exports, the loaded event is your proof of shipment for the buyer or the bank.

If nothing comes up, check whether the number is actually an APL reference from before the switch. If it's stuck, ask CNC or your forwarder, since CNC tracking only has what the carriers and terminals report. To track a CNC container through a transshipment that seems to have gone quiet, the hub port's own events are often the first to update.

Keep the old APL paperwork in the drawer anyway. Someone always asks.

常见问题

如何跟踪CNC的集装箱?

在本页跟踪表单中输入集装箱号并搜索,查看CNC货运记录中最新可用的事件、地点和日期。如果使用其他参考编号,请先确认表单支持哪些编号类型。

跟踪CNC集装箱需要什么编号?

请先使用运输单据上的集装箱号。如果CNC的表单提供相应选项,也可使用提单号或订舱号。采购订单号或发票号不能代替系统支持的跟踪编号。

在哪里可以找到CNC集装箱号?

请查看提单、发运确认文件或设备单据。标准ISO货运集装箱号由4个字母和7位数字组成。如果找不到,请向托运人或负责CNC订舱的公司索取。

CNC跟踪中的ETA是什么意思?

ETA指预计到达时间。请确认CNC结果中的预计时间对应哪个地点:到港不等于送达仓库。该日期属于估算,并非已确认的交货预约时间。

为什么CNC跟踪没有搜索结果?

请检查编号是否输入有误,并确认货物由CNC承运。新货运记录可能尚未提供。如果仍无结果,请让托运人或货运代理确认编号及负责运输的承运人。

CNC集装箱跟踪多久更新一次?

并非所有货运记录都有统一的更新间隔。系统获得CNC的新跟踪数据后,才会显示相应事件。一段时间内没有新节点,本身并不能证明货物延误或集装箱停止移动。

全部承运人 A–Z

Globy 上的所有船公司和 NVOCC,按 A 到 Z 排列。